Abstract
This poster looks at aspects of a project set up by Practical Action in Bangladesh which aimed to enhance early warning systems for flooding.
Further information
| Collections | |
| Issue date | 20/06/2017 |
This poster looks at aspects of a project set up by Practical Action in Bangladesh which aimed to enhance early warning systems for flooding.
| Collections | |
| Issue date | 20/06/2017 |